Tailings Storage Facility

Tailings Storage Facility

Overhead footage showing commissioning of our Client’s newly raised tailings storage facility (TSF). This TSF is transitioning from a split cell facility with two decant causeways, to a single cell facility with a central rock ring decant. REC is responsible for the design, construction and operation of this facility, inclusive of earthworks QA and survey control. The new Stage 1 design represents a substantial departure from the original conception provided by others. By merging the two cells REC has significantly decreased construction costs, maintained storage volume and increased decant water return.

REC offers detailed design reviews and preliminary mine waste management advice at no cost. Please contact us to find out more.